Skip to content
VFD & industrial
electronics repair

Repair service

Load testing and drive calibration

Every repaired drive is run at rated current for at least 30 minutes before dispatch. Pre-installation testing of new drives also offered.

Load testing with lamps and meters

Every drive we repair is load-tested before dispatch. We also offer the same testing as a separate service, for new drives before installation or for drives you want checked.

The test

  1. No-load power-up: output voltage, frequency and waveform
  2. Test motor connected for the drive’s rating
  3. Full load at rated current for at least 30 minutes
  4. IGBT and heatsink temperatures checked under load
  5. Parameters verified
  6. Written report with input and output measurements

This removes the risk of a drive failing on first power-up at your plant, and the downtime and site visit that come with it.

Breakdown support

Drive down? Send us the nameplate.

A clear photo of the nameplate and the fault code on the display is usually enough for us to tell you what's likely wrong and what it will take.